The project generally consists of, but is not necessarily limited to, the following major items:
• Installation of approximately 987 LF of 24” storm drain.
• Installation of 9 storm drain manholes, including 2 drop manholes.
• Open channel drainage restoration.
• Tree removal, as necessary.
|
|
3/20/2020 5:00 PM
|
|
4/7/2020 2:00 PM
|
|
City Clerk, City of Missoula, 435 Ryman Street, Missoula, Montana, 59802
|
|
Mayor's Conference Room
|
|
April 1, 2020 @ 2pm
|
|
Molly R. Davidson, PE Senior Water Resources Engineer, Morrison-Maierle 406.542.4825 direct mdavidson@m-m.net 1055 Mount Ave., Missoula, MT 59801
|
|
Prospective Bidders must purchase contract documents through QuestCDN. QuestCDN is a web-based platform for construction project advertisements, bid documents distribution and plan holder lists. Prospective bidders will need the seven-digit QuestCDN project number (6918506) to locate the job on the QuestCDN website search page. Bids will not be accepted from any prospective bidder who has not purchased contract documents through QuestCDN. There will be a Pre-Bid Conference at the office of Missoula Water, 1345 W Broadway St, Missoula, Montana 59802, at 2:00 o'clock p.m. on April 1st, 2020. Interested CONTRACTORS are required to attend. It is the Contractor’s responsibility to be familiar with the site and any constraints to the bid. A tour of the project site(s) will be conducted after the meeting.
|
|
|
|