Construction

What We Do?

The Street Division will Mill and Pave streets that are in need of a complete resurface. Other streets that have good structure will have a layer asphalt applied to them called an overlay. Construction months are from May through October.

  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

What Should Residents Do?

  • Please drive careful around construction site and follow traffic control

Did You Know?

  • Once the asphalt is applied to the street surface temperatures can reach from 180 to 200 degrees.