Public Works Standards & Specifications Manual
This version of the Missoula City Public Works Standards & Specifications Manual (MCPWSS) is in effect from December 1, 2021, until its next update. All projects that have not yet submitted Stage 3 of the Public Infrastructure Review Stage Process must follow the standards and specifications, stage checklists, and standard drawings for the manual version shown below.
All projects with Stage 3 submitted between November 18, 2020, and November 30, 2021, may continue to follow the standards and specifications, stage checklists, and standard drawings for the 2020-21 PW Standards & Specifications Manual version (link also at left), or the project engineers may follow this newest version of the manual if they so choose.
Projects with Stage 3 submitted before November 18, 2020, will continue to follow the previous standards and specifications versions and stage checklists in place before the MCPWSS was in effect. They can be found on the Development Services web pages here.
**Tip for manual users: Hold down the Ctrl button while clicking on a document link. This will open the linked document in a new window.**
Updates, clarifications, and other relevant information needed between manual versions will be posted on our Engage Missoula page at https://www.engagemissoula.com/admin/projects/public-works-infrastructure-standards-review.
Introduction
Chapter 1 – General Provisions (Chapter text expected mid-2022)
Appendix 1-A – Definitions
Appendix 1-B – MCPWSS Manual Comment Form
Chapter 2 – Construction Within the Right-of-Way
Appendix 2-A – Standard Modifications to MPWSS
Appendix 2-B – Standard Drawings
Appendix 2-C – Services in Right-of-Way Request
Appendix 2-D – Street or Alley Closure Notice
Appendix 2-E – Pre-Con Meeting Agenda & Safety Checklist
Appendix 2-F – Municipal Utility Easement Template
Chapter 3 – Improvement Plans
Appendix 3-A – Site Plan Checklists (Commercial & Residential)
Appendix 3-B – Public Infrastructure Review – Stage Process Checklists
Appendix 3-C – MFE Packet Requirements
Appendix 3-D – Public Infrastructure Review Stage Process Roadmap
Appendix 3-E – Improvements Agreement & Security Procedures
Chapter 4 – Water System
Appendix 4-A – Cross-Connection/Backflow Protection Program
Appendix 4-B – Water Ditch Card Template (updated 1-21-2022)
Appendix 4-C – Allowable Non-Storm Water Discharges Policy
Chapter 5 - Sanitary Sewer System
Appendix 5-A – 2021 City of Missoula STEP Manual
Appendix 5-B – FOG Sector Control Program
Appendix 5-C – Grease Interceptor Sizing Worksheet
Appendix 5-D – Sewer Ditch Card Template
Chapter 6 – Stormwater System
Appendix 6-A – Stormwater Management Site Plan Review Checklist
Appendix 6-B – Stormwater Site Evaluation Form
Appendix 6-C – Stormwater Drainage Report Content
Appendix 6-D – Stormwater Facility Maintenance Agreement
Appendix 6-E – Operation and Maintenance Manual
Appendix 6-F – Test Pit Infiltration Test Method
Appendix 6-G – Infiltration Testing Exemption Map
Chapter 7 – Transportation System
Chapter 8 – Erosion Control
Appendix 8-A – City Storm Water Compliance Permits Flow Chart
Appendix 8-B – Stormwater Permit
Appendix 8-C – Erosion Control Site Plan Review Checklist
Appendix 8-D – Landscape Agreement Form
Appendix 8-E – Construction Site Inspection Form