The Street Maintenance Division mills and paves streets that are in need of a complete resurfacing. Other streets that have good structure will have a layer asphalt applied to them called an overlay. Construction months are from May through October.
What Should Residents Do?
Please drive carefully around construction sites and follow traffic control signs and flaggers.
Did You Know?
Once the asphalt is applied to the street, surface temperatures can reach from 180 to 200 degrees.